Shape Up (Library) reference
Shape Up is Basecamp's methodology for building products through fixed-time, variable-scope cycles. Created by Ryan Singer and popularized through the free online book, Shape Up emphasizes appetite-driven development, thoughtful upfront shaping, strategic betting, and autonomous team execution with visual progress tracking.
Shape Up
Overview
Shape Up is Basecamp's methodology for building products through fixed-time, variable-scope cycles. Created by Ryan Singer and popularized through the free online book, Shape Up emphasizes appetite-driven development, thoughtful upfront shaping, strategic betting, and autonomous team execution with visual progress tracking.
**Creator**: Ryan Singer / Basecamp **Year**: 2019 **Book**: Shape Up: Stop Running in Circles and Ship Work that Matters (free online)
Core Philosophy
- **Fixed time, variable scope**: 6-week cycles (or 2-week small batches) with no extensions
- **Appetite not estimates**: Define how much time you want to spend, not how long it will take
- **Shaping before betting**: Abstract design work happens before committing resources
- **Betting table**: Senior team explicitly decides what to build
- **Autonomous teams**: Small teams (designer + 1-2 programmers) work independently
- **Hill charts**: Visual progress tracking showing figuring-out vs. executing
- **Circuit breaker**: If work isn't done in 6 weeks, it doesn't get extended automatically
- **No backlogs**: Work that doesn't get chosen is discarded
Key Principles
1. Appetite-Driven Development
Instead of asking "how long will this take?", ask "how much time do we want to spend on this?"
- **Small batch**: 1-2 weeks (one designer + one programmer)
- **Big batch**: 6 weeks (one designer + two programmers)
2. Shaping
Abstract design work at the right level of detail:
- **Breadboarding**: Flow and affordances without visual design
- **Fat marker sketches**: Rough UI concepts that leave room for creativity
- **Rabbit holes**: Explicitly call out risks and time traps
- **No-gos**: Things we explicitly won't do
3. Betting
Every 6 weeks, senior team meets at the "betting table":
- Reviews shaped pitches
- Decides what gets resources
- No backlog maintenance
- Work either gets bet on or discarded
4. Building
Autonomous teams with freedom to solve problems:
- Get oriented and understand the terrain
- Map work into scopes (integrated slices)
- Track progress on hill charts
- Integrate QA throughout
- Ship or stop at end of cycle (circuit breaker)
5. Cool-Down
2-week breaks between cycles:
- Fix bugs
- Pay down technical debt
- Explore new ideas
- Rest and recharge
- No structured project work
Methodology
Phase 1: Shaping (Pre-Cycle)
Senior product people shape work before it goes to betting:
1. **Set Boundaries** - Define appetite and constraints 2. **Rough Out Elements** - Create breadboard showing places, affordances, connections 3. **Address Risks** - Identify rabbit holes and define no-gos 4. **Write Pitch** - Formal document for betting table
**Time**: Days to weeks of deliberate shaping work **Output**: Pitch document with problem, solution, appetite, risks
Phase 2: Betting (Between Cycles)
Senior team decides what to build:
1. **Review Pitches** - Evaluate shaped work 2. **Assess Capacity** - Check team availability 3. **Make Bets** - Explicitly commit resources 4. **Create Cycle Plan** - Set up team and logistics
**Time**: 1-2 hour meeting every 6 weeks **Output**: Bets placed, teams assigned, cycle started
Phase 3: Building (6-Week Cycle)
Autonomous team builds the shaped work:
1. **Get Oriented** (Week 1) - Understand the terrain, explore codebase 2. **Map Scopes** (Week 1-2) - Break work into integrated slices 3. **Execute** (Week 1-6) - Build scopes, move them on hill chart 4. **Track Progress** - Weekly check-ins with hill charts 5. **Integrate QA** (Throughout) - Test and validate continuously 6. **Circuit Breaker** (Week 6) - Ship, cut scope, or stop
**Time**: 6 weeks (or 2 weeks for small batch) **Output**: Shipped feature or clear decision to stop
Phase 4: Cool-Down (2 Weeks)
Team breaks between cycles:
1. **Fix Bugs** - Address issues from recent cycle 2. **Tech Debt** - Refactor and clean up 3. **Explore** - Investigate new ideas 4. **Rest** - Recharge for next cycle
**Time**: 2 weeks **Output**: Cleaned up codebase, explored ideas, rested team
Process Workflow
Shaping (ongoing)
→ Define appetite
→ Breadboard solution
→ Identify rabbit holes
→ Fat marker sketches
→ Write pitch
↓
[Review Pitch]
↓
Betting Table (every 6 weeks)
→ Evaluate pitches
→ Assess capacity
→ Place bets
→ Assign teams
↓
[Bet Placed]
↓
Building (6 weeks)
→ Get oriented (Week 1)
→ Map scopes (Week 1-2)
→ Execute cycle (Week 1-6)
→ Track hill charts (Weekly)
→ QA integration (Throughout)
→ Circuit breaker (Week 6)
↓
[Ship or Stop]
↓
Cool-Down (2 weeks)
→ Fix bugs
→ Tech debt
→ Explore ideas
→ RetrospectiveUsage
Full Cycle
Run complete Shape Up cycle from shaping through cool-down:
import { runProcess } from '@a5c-ai/babysitter-sdk';
const result = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Add ability to bulk edit customer records',
appetite: 'big-batch',
cycleWeeks: 6,
teamSize: 'one-designer-two-programmers',
phase: 'full-cycle',
includeCoolDown: true
});Shaping Only
Shape work to create a pitch:
const shapingResult = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Add ability to bulk edit customer records',
appetite: 'big-batch',
phase: 'shaping'
});
// Use shapingResult.pitch for betting tableBetting Only
Evaluate an existing pitch:
const bettingResult = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Add ability to bulk edit customer records',
existingPitch: previousPitch,
competingPitches: [pitch1, pitch2, pitch3],
teamCapacity: {
availableTeams: 2,
teamComposition: 'one-designer-two-programmers',
currentCommitments: ['Cycle 5 project']
},
phase: 'betting'
});Building Only
Execute a cycle with an existing pitch:
const buildingResult = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Add ability to bulk edit customer records',
existingPitch: approvedPitch,
cycleWeeks: 6,
teamSize: 'one-designer-two-programmers',
phase: 'building'
});Small Batch (2 Weeks)
const smallBatch = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Fix PDF export formatting issues',
appetite: 'small-batch',
cycleWeeks: 2,
teamSize: 'one-designer-one-programmer',
phase: 'full-cycle'
});Input Parameters
| Parameter | Type | Required | Default | Description |
|---|---|---|---|---|
projectName | string | Yes | - | Project name |
workDescription | string | Yes | - | Description of work to shape/build |
appetite | string | No | 'big-batch' | Time appetite: 'small-batch' (1-2 weeks) or 'big-batch' (6 weeks) |
cycleWeeks | number | No | 6 | Cycle length in weeks |
teamSize | string | No | 'one-designer-two-programmers' | Team composition |
phase | string | No | 'full-cycle' | Which phase to run: 'shaping', 'betting', 'building', 'cool-down', 'full-cycle' |
existingPitch | object | No | null | Existing pitch document (for betting/building) |
competingPitches | array | No | [] | Other pitches competing for resources |
teamCapacity | object | No | null | Team capacity and availability |
includeCoolDown | boolean | No | true | Include cool-down phase |
cycleStartDate | string | No | Current date | ISO date string for cycle start |
Output Structure
{
success: boolean,
projectName: string,
workDescription: string,
appetite: string,
phase: string,
// Shaping outputs
appetiteDefinition: {
appetite: string,
timeEstimate: string,
problemStatement: string,
boundaries: { mustHave, niceToHave, notNow },
inScope: [],
outOfScope: [],
successCriteria: []
},
breadboard: {
places: [{ id, name, description, type }],
affordances: [{ id, name, placeId, type, description }],
connections: [{ from, to, affordance, description }],
flow: { entryPoint, mainPath, alternatePaths, exitPoints }
},
rabbitHoles: {
rabbitHoles: [{ id, area, description, severity, deRiskingStrategy }],
noGos: [{ id, feature, rationale }],
risks: [{ id, category, description, impact, likelihood }],
mitigation: [{ riskId, strategy, owner }]
},
sketches: {
sketches: [{ id, placeId, title, description, elements }],
keyElements: [{ element, purpose, behavior }],
annotations: []
},
pitch: {
pitchMarkdown: string,
summary: string,
problem: { statement, whyNow, impact },
solution: { overview, approach, keyElements },
appetite: { type, duration, teamSize },
rabbitHoles: [],
noGos: []
},
// Betting outputs
bettingEvaluation: {
recommendation: 'bet' | 'pass' | 'needs-more-shaping',
score: number,
rationale: string,
keyFactors: [{ factor, assessment, weight }],
strengths: [],
concerns: [],
capacityAssessment: { teamAvailable, timing, conflicts }
},
cyclePlan: {
timeline: { startDate, endDate, weeks, checkInDays },
team: { designer, programmers, qa, size },
milestones: [{ week, description, deliverable }],
successCriteria: []
},
// Building outputs
orientation: {
orientationSummary: string,
startingPoints: [],
codebaseAreas: [{ area, familiarity, complexity }],
unknowns: [],
initialTasks: [{ task, type, assignee }]
},
scopeMap: {
scopes: [{ id, name, description, priority, complexity, estimatedWeeks }],
dependencies: [{ scopeId, dependsOn, type }],
scopeMap: { totalScopes, mustHaveScopes, criticalPath }
},
cycleExecution: {
executionSummary: string,
scopeProgress: [{ scopeId, status, weekCompleted, surprises }],
challenges: [{ scopeId, challenge, resolution, impactWeeks }]
},
hillChartHistory: [{
week: number,
scopePositions: [{ scopeId, position, phase, movement, notes }],
uphill: [],
downhill: [],
completed: [],
stuckScopes: [{ scopeId, reason, intervention }],
riskLevel: string
}],
qaAndIntegration: {
testResults: [{ scopeId, testsPassed, testsFailed, coverage }],
bugs: [{ id, severity, scopeId, description, mustFixForShip }],
passed: boolean,
shipReadiness: { recommendation, rationale, blockingIssues }
},
circuitBreaker: {
status: 'complete' | 'incomplete' | 'partial',
decision: 'ship' | 'cut-scope-and-ship' | 'stop',
completed: [],
incomplete: [],
rationale: string,
learnings: [{ learning, category }],
appetiteAssessment: { wasAccurate, shouldHaveBeen, notes }
},
// Cool-down outputs
coolDown: {
duration: string,
activities: [{ type, description, assignee, completed }],
retrospective: { wentWell, wentPoorly, learnings, actionItems },
explorations: [{ idea, findings, potentialPitch }]
},
// Summary
summary: {
phase: string,
appetite: string,
cycleWeeks: number,
pitched: boolean,
betPlaced: boolean,
scopeCount: number,
completionRate: string,
shipped: boolean,
coolDownIncluded: boolean
},
artifacts: {
shaping: 'artifacts/shape-up/shaping/',
betting: 'artifacts/shape-up/betting/',
building: 'artifacts/shape-up/building/',
coolDown: 'artifacts/shape-up/cool-down/'
}
}Examples
Example 1: Customer Bulk Edit Feature
**Context**: Established SaaS product needs ability to edit multiple customer records at once.
const result = await runProcess('methodologies/shape-up', {
projectName: 'Acme CRM',
workDescription: 'Add ability to select multiple customers and edit common fields in bulk',
appetite: 'big-batch',
cycleWeeks: 6,
teamSize: 'one-designer-two-programmers',
phase: 'full-cycle'
});**Shaping Output**:
- **Problem**: Sales team wastes hours editing customers one-by-one when updating territories
- **Appetite**: 6 weeks (big batch)
- **Solution**: Selection UI + bulk edit dialog
- **Rabbit Holes**: Complex field validation, undo/redo, conflict resolution
- **No-Gos**: Bulk create, advanced filtering, scheduled edits
**Betting Output**:
- **Score**: 85/100
- **Decision**: Bet placed
- **Strengths**: Clear value, well-shaped, fits appetite
- **Concerns**: Integration with permissions system
**Building Output**:
1. Selection mechanism (Week 1-2) 2. Bulk edit dialog (Week 2-3) 3. Field validation (Week 3-4) 4. Permission checks (Week 4-5) 5. Error handling (Week 5-6)
- **Scopes**:
- **Completion**: 5/5 scopes shipped
- **Circuit Breaker**: Ship
Example 2: Mobile App Notifications
**Context**: New mobile app needs push notification system.
const result = await runProcess('methodologies/shape-up', {
projectName: 'FitTracker Mobile',
workDescription: 'Add push notifications for daily goals and achievements',
appetite: 'big-batch',
cycleWeeks: 6,
teamSize: 'one-designer-two-programmers',
phase: 'full-cycle'
});**Shaping Output**:
- **Problem**: Users forget to log workouts; need timely reminders
- **Appetite**: 6 weeks
- **Solution**: Daily goal reminders + achievement celebrations
- **Rabbit Holes**: Notification scheduling, time zones, notification grouping
- **No-Gos**: Custom schedules, rich notifications with images, notification history
**Building Output**:
1. Push notification infrastructure (Week 1-2) 2. Daily goal reminders (Week 2-3) 3. Achievement notifications (Week 3-4) 4. User preferences (Week 4-5) 5. Testing and polish (Week 5-6)
- **Scopes**:
- **Hill Chart Week 4**: 2 scopes uphill (preferences, testing), 3 downhill
- **Circuit Breaker**: Ship with known limitation (no custom schedules)
Example 3: Small Batch Bug Fix
**Context**: PDF export has formatting issues that frustrate users.
const result = await runProcess('methodologies/shape-up', {
projectName: 'DocGen Pro',
workDescription: 'Fix PDF export formatting issues with tables and images',
appetite: 'small-batch',
cycleWeeks: 2,
teamSize: 'one-designer-one-programmer',
phase: 'full-cycle'
});**Shaping Output**:
- **Problem**: Tables break across pages poorly, images distorted
- **Appetite**: 2 weeks (small batch)
- **Solution**: Improved pagination logic + image scaling
- **Rabbit Holes**: Complex nested tables, SVG rendering
- **No-Gos**: Full table redesign, new export formats
**Building Output**:
1. Table pagination (Week 1) 2. Image scaling (Week 1-2)
- **Scopes**:
- **Completion**: 2/2 scopes shipped
- **Circuit Breaker**: Ship
Example 4: Bet Not Placed
**Context**: Pitch evaluated but not selected.
const result = await runProcess('methodologies/shape-up', {
projectName: 'TeamHub',
workDescription: 'Add advanced analytics dashboard with custom reports',
appetite: 'big-batch',
phase: 'shaping'
});
// Later at betting table
const betting = await runProcess('methodologies/shape-up', {
projectName: 'TeamHub',
workDescription: 'Add advanced analytics dashboard with custom reports',
existingPitch: result.pitch,
competingPitches: [urgentSecurityPatch, requestedIntegration],
phase: 'betting'
});
// Result: Pass - security and integration higher priority**Betting Output**:
- **Score**: 72/100
- **Decision**: Pass
- **Rationale**: Nice to have but security patch and integration higher priority
- **Future**: May reshape with smaller appetite for future cycle
Hill Charts Explained
The hill chart is Shape Up's signature progress visualization:
Hill Metaphor
/\
/ \
/ \
/ \
/ \
/ \
/ \
/______________\
Left Top Right- **Left side (Uphill)**: Figuring things out, solving unknowns, exploration
- **Top of hill**: Transition - unknowns resolved, approach clear
- **Right side (Downhill)**: Executing known solution, building it out
- **Far right**: Complete
Scope Movement
- **Forward**: Scope making progress
- **Stuck**: No movement for 1+ weeks, needs intervention
- **Backward**: Discovered new unknowns, moved left on hill
Risk Assessment
- **Low risk**: Most scopes downhill, nearing completion
- **Medium risk**: Mix of uphill and downhill, some stuck
- **High risk**: Many scopes uphill late in cycle, multiple stuck
Example Hill Chart (Week 4 of 6)
Scope Positions:
- Selection UI: Position 75 (downhill) - executing known solution
- Bulk edit dialog: Position 85 (downhill) - nearly complete
- Field validation: Position 50 (top) - just figured out approach
- Permission checks: Position 30 (uphill) - still figuring out
- Error handling: Position 10 (uphill) - early exploration
Risk: Medium (permissions scope needs attention)Integration Points
With BDD/Specification by Example
Use BDD to specify acceptance criteria during shaping:
// Shape the work
const pitch = await runProcess('methodologies/shape-up', {
workDescription: 'Bulk customer edit',
phase: 'shaping'
});
// Create BDD scenarios for shaped scopes
const bdd = await runProcess('methodologies/bdd-specification-by-example', {
feature: pitch.pitch.solution.overview,
stakeholders: ['Product', 'Dev', 'QA']
});With Domain-Driven Design
Use DDD strategic patterns during shaping:
// Understand domain during shaping
const ddd = await runProcess('methodologies/domain-driven-design', {
phase: 'strategic'
});
// Use bounded contexts and aggregates in breadboard
const pitch = await runProcess('methodologies/shape-up', {
workDescription: 'Order fulfillment workflow',
phase: 'shaping'
});With ATDD/TDD
Use shaped work to drive test-driven development:
// Build cycle with TDD
const cycle = await runProcess('methodologies/shape-up', {
existingPitch: approvedPitch,
phase: 'building'
});
// Implement each scope test-first
for (const scope of cycle.scopeMap.scopes) {
await runProcess('methodologies/atdd', {
acceptanceCriteria: scope.description
});
}Best Practices
Shaping
1. **Set clear appetite first** - Constraint drives creative solutions 2. **Stay at right level of abstraction** - Not too specific, not too vague 3. **Call out rabbit holes explicitly** - Help team avoid time traps 4. **Define no-gos clearly** - Prevent scope creep 5. **Make it a pitch, not a spec** - Leave room for team creativity 6. **Get design at room temperature** - Warm enough to evaluate, cool enough to be flexible 7. **Breadboard before visual design** - Focus on flow and functionality first
Betting
1. **Bet consciously** - Every bet is an opportunity cost 2. **Don't maintain backlogs** - Old ideas get stale; reshape if still relevant 3. **Allow uninterrupted time** - Give teams full 6 weeks without interruptions 4. **Respect the circuit breaker** - No automatic extensions 5. **Bet on problems, not solutions** - Teams might find better approaches 6. **Consider team composition** - Match complexity to team experience 7. **Time box the meeting** - Betting table shouldn't take more than 2 hours
Building
1. **Get oriented first** - Understand terrain before diving in 2. **Map scopes thoughtfully** - Each scope should be shippable slice 3. **Update hill charts honestly** - Don't hide stuck work 4. **Integrate QA throughout** - Don't leave testing until end 5. **Cut scope if needed** - Preserve core value, drop nice-to-haves 6. **Respect the cycle** - Don't extend automatically 7. **Communicate through hill charts** - Visual updates beat status reports
Cool-Down
1. **Actually rest** - Don't pack cool-down with structured work 2. **Fix annoying bugs** - Address technical debt 3. **Explore freely** - Investigation might lead to future pitches 4. **Reflect on cycle** - What went well? What to improve? 5. **Don't commit to deliverables** - Cool-down is unstructured time 6. **Recharge for next cycle** - Team needs breaks between intense cycles
Common Patterns
Appetite-First Design
Always start with appetite, then fit solution:
// Wrong: "How long will bulk edit take?"
// Right: "We'll spend 6 weeks on bulk edit. What can we build?"
const result = await runProcess('methodologies/shape-up', {
workDescription: 'Bulk edit capability',
appetite: 'big-batch', // Set constraint first
phase: 'shaping'
});Graduated Commitment
Start small, expand if valuable:
// Cycle 1: Basic bulk edit (6 weeks)
const basic = await runProcess('methodologies/shape-up', {
workDescription: 'Basic bulk edit for common fields',
appetite: 'big-batch'
});
// Later cycle if successful: Advanced features
const advanced = await runProcess('methodologies/shape-up', {
workDescription: 'Advanced bulk edit with formulas and validations',
appetite: 'big-batch'
});Circuit Breaker in Action
Don't extend cycles:
// Cycle ends, work incomplete
if (result.circuitBreaker.status === 'incomplete') {
// Option 1: Ship partial work
// Option 2: Discard and reshape for future bet
// Option 3: Cut scope and ship core
// Never: Extend the cycle
}Troubleshooting
Problem: Work doesn't fit appetite
**Solution**: Shape more aggressively
- Define more no-gos
- Simplify solution
- Consider smaller appetite
- Break into multiple pitches
Problem: Scopes stuck uphill late in cycle
**Solution**: Intervene early
- Pair with experienced developer
- Simplify the scope
- Cut scope if not must-have
- Surface blockers to leadership
Problem: Too many competing pitches
**Solution**: Be ruthless at betting table
- Focus on strategic priorities
- Consider if pitch really needs 6 weeks
- Reshape as small batch
- Pass and discard old ideas
Problem: Team extends cycle
**Solution**: Enforce circuit breaker
- Ship what's done
- Reshape for future bet
- Learn from appetite mismatch
- Don't reward extensions
Problem: Shaping too specific or too vague
**Solution**: Find room temperature
- Too hot: Remove implementation details
- Too cold: Add concrete examples
- Just right: Can see it works, room for creativity
Artifacts Generated
Shaping Phase
artifacts/shape-up/shaping/pitch.md- Complete pitch documentartifacts/shape-up/shaping/breadboard.md- Flow and affordancesartifacts/shape-up/shaping/sketches.md- Fat marker sketchesartifacts/shape-up/shaping/rabbit-holes.json- Risks and no-gos
Betting Phase
artifacts/shape-up/betting/evaluation.md- Betting table assessmentartifacts/shape-up/betting/comparison.md- Competing pitches comparisonartifacts/shape-up/betting/cycle-plan.json- Execution plan
Building Phase
artifacts/shape-up/building/scope-map.md- Scope breakdownartifacts/shape-up/building/scope-diagram.md- Scope dependenciesartifacts/shape-up/building/hill-chart-week-N.md- Weekly hill chartsartifacts/shape-up/building/progress-week-N.json- Progress dataartifacts/shape-up/building/final-hill-chart.md- End of cycle chartartifacts/shape-up/building/circuit-breaker.md- Ship/stop decisionartifacts/shape-up/building/qa-report.md- QA results
Cool-Down Phase
artifacts/shape-up/cool-down/activities.md- Cool-down workartifacts/shape-up/cool-down/cycle-retrospective.md- Learnings
References
Official Resources
- **Shape Up Book** - Complete methodology (free online)
- **Basecamp Blog** - Articles about Shape Up in practice
- **Ryan Singer on Twitter** - Ongoing insights
Key Chapters
1. **Introduction** - Philosophy and principles 2. **Shaping** - Breadboarding, fat marker sketches, pitches 3. **Betting** - The betting table, capacity, saying no 4. **Building** - Getting oriented, scopes, hill charts 5. **Conclusion** - Circuit breaker, cool-down, cycles
Tools
- **Basecamp** - Built using Shape Up methodology
- **Hill Charts in Basecamp** - Official implementation
- **ShapeUp.how** - Community resources (if available)
Articles
- Introducing Hill Charts - Progress visualization
- No Deadlines - Fixed time approach
- The Betting Table - How Basecamp decides what to build
Comparisons
- **vs. Scrum**: Fixed time (not fixed scope), 6 weeks (not 2), no daily standups
- **vs. Kanban**: Batched work (not continuous flow), clear cycles (not continuous)
- **vs. Waterfall**: Small cycles (not big bang), variable scope (not fixed scope)
- **vs. Feature-Driven Development**: Appetite-driven (not feature-driven), betting (not backlog)
Real-World Adoption
Shape Up works well for:
- **Product teams** building software products
- **Small to medium teams** (not ideal for very large orgs)
- **Established products** with ongoing development
- **Teams with experienced shapers** who can abstract well
- **Organizations** that can commit to uninterrupted time
Shape Up may not fit:
- **Client services** with fixed-scope contracts
- **Regulated industries** with extensive documentation requirements
- **Very large organizations** with many dependencies
- **Teams without senior designers/shapers**
- **Projects with immovable deadlines**
License
Part of the Babysitter SDK orchestration framework.
Shape Up methodology is by Basecamp (Ryan Singer). The methodology is freely available through their online book.