Agentic AI Atlasby a5c.ai
OverviewWikiGraphFor AgentsEdgesSearchWorkspace
/
GitHubDocsDiscord
iiRecord
Agentic AI Atlas · Phase 6: Milestone Summary
page:docs-genty-features-backlog-updated-phase6-milestone-summarya5c.ai
Search record views/
Record · tabs

Available views

II.Record viewspp. 1 - 1
overviewarticlejsongraph
II.
Page overview

page:docs-genty-features-backlog-updated-phase6-milestone-summary

Reference · live

Phase 6: Milestone Summary overview

Inspect the raw attributes, linked wiki pages, and inbound or outbound graph edges for page:docs-genty-features-backlog-updated-phase6-milestone-summary.

PageOutgoing · 0Incoming · 1

Attributes

nodeKind
Page
sourcePath
docs/genty-features-backlog-updated/phase6-milestone-summary.md
sourceKind
repo-docs
title
Phase 6: Milestone Summary
displayName
Phase 6: Milestone Summary
slug
docs/genty-features-backlog-updated/phase6-milestone-summary
articlePath
wiki/docs/genty-features-backlog-updated/phase6-milestone-summary.md
article
# Phase 6: Milestone Summary Executive summary of the M0-M5 roadmap with effort distribution, risk profile, and success criteria. --- ## Milestone Overview ``` M0 [=====] Quick Wins + Foundation 16 gaps ~3M effort 0 blockers M1 [========] Critical Path 7 gaps ~L-XL effort M0 required M2 [==========] Parallel Tracks 16 gaps ~XL effort M0 required M3 [==========] Integration 11 gaps ~XL effort M1+M2 required M4 [==========] Polish and UX 12 gaps ~XL effort M0 respec + M1 M5 [===========] Ecosystem + Long-Tail 16 gaps ~XL-XXL M2-M4 required ``` --- ## M0: Quick Wins and Foundation | Attribute | Value | |-----------|-------| | **Gap count** | 16 actionable + 1 respec | | **Effort** | ~3 M equivalent (11 S items + 2 M items + 1 respec session) | | **Risk profile** | 14 Low, 2 Medium, 1 High (the respec) | | **Parallel capacity** | All 11 quick wins can run in parallel | | **Dependencies** | None -- everything can start immediately | **Success criteria:** - CLI harness streaming outputs in real-time (GAP-SUBOBS-001) - Prompt caching reduces API costs measurably (GAP-PERF-001) - Long-term memories appear in new run prompts (GAP-STATE-001) - Plugin blocklist and trust levels operational (GAP-ECO-003, GAP-SEC-002) - UX-001 has a written respec targeting tula-ui or observer-dashboard - All 8 parallel track foundations initiated **Key risk:** UX-001 respec decision. If deferred, the entire Track 6 (13 gaps in M4) remains blocked. --- ## M1: Critical Path Items | Attribute | Value | |-----------|-------| | **Gap count** | 7 | | **Effort** | ~L-XL equivalent (2 S + 4 M + 1 L) | | **Risk profile** | 2 Medium, 4 High, 1 Critical (PERF-002) | | **Parallel capacity** | M1a and M1b can run in parallel. M1c depends on both. M1d is independent. | | **Dependencies** | M0: SUBOBS-001, AGENT-001, PROMPT-006 | **Success criteria:** - Subagent progress displays percentage and ETA (GAP-SUBOBS-002) - Effects execute concurrently in orchestration loop (GAP-PAR-001) - Multi-harness dispatch with team coordination (GAP-PAR-003) - Session compaction preserves context across strategies (GAP-PERF-002) **Key risk:** PAR-001 (concurrent execution) requires core loop changes. Feature-flag the concurrent path. --- ## M2: Parallel Track Items | Attribute | Value | |-----------|-------| | **Gap count** | 16 | | **Effort** | ~XL equivalent (8 S + 5 M + 2 L) | | **Risk profile** | 10 Low, 4 Medium, 2 High (ECO-002, REMOTE-003) | | **Parallel capacity** | 5 sub-groups (M2a-M2e) run independently | | **Dependencies** | M0 track foundations | **Success criteria:** - CC marketplace protocol adapter works (GAP-ECO-002) - Remote sessions connect and deliver events (GAP-REMOTE-003) - Prompt plan inspection and context introspection commands available (GAP-OBS-003, GAP-OBS-005) - Process versioning detects mismatches on resume (GAP-PROC-003) - Built-in templates packaged with harness profiles (GAP-AGENT-004) **Key risk:** ECO-002 depends on CC marketplace API stability. Abstract behind PluginSource interface. --- ## M3: Integration Milestones | Attribute | Value | |-----------|-------| | **Gap count** | 11 | | **Effort** | ~XL equivalent (3 S + 4 M + 3 L) | | **Risk profile** | 2 Low, 5 Medium, 4 High | | **Parallel capacity** | M3a-M3e have different dependency chains and can partially overlap | | **Dependencies** | M1 (critical path complete) + M2 (tracks progressed) | **Success criteria:** - Process orchestration dynamically routes to harnesses (GAP-AGENT-003) - Cross-run messaging delivers between active runs (GAP-AGENT-005) - Git worktree isolation prevents conflicts in parallel code tasks (GAP-TOOLS-017) - CC plugin compatibility layer loads CC plugins (GAP-ECO-001) - Context compression uses semantic families (GAP-PROMPT-007) **Key risk:** AGENT-003 restructures the core orchestration loop. Spike and feature-flag. --- ## M4: Polish and UX | Attribute | Value | |-----------|-------| | **Gap count** | 12 | | **Effort** | ~XL equivalent (2 S + 4 M + 3 L + 3 additional) | | **Risk profile** | 4 Low, 4 Medium, 4 High (UX respec chain) | | **Parallel capacity** | M4a must complete before M4b. M4c is partially independent. | | **Dependencies** | M0 (UX-001 respec), M1 (streaming data), M3 (summarization for triage) | **Success criteria:** - Rendering foundation operational on chosen platform (GAP-UX-001) - Effect tree and streaming output panels render live data (GAP-UX-001a, GAP-UX-001f) - Breakpoint approval shows risk context and recommendations (GAP-UX-001c) - Resume dashboard with run picker works (GAP-UX-008) - ctx.workflow() intrinsic supports conditional branching (GAP-TOOLS-023) **Key risk:** If UX-001 respec is not completed in M0, all of M4 shifts right. --- ## M5: Ecosystem and Long-Tail | Attribute | Value | |-----------|-------| | **Gap count** | 16 | | **Effort** | ~XL-XXL equivalent (2 S + 5 M + 9 L) | | **Risk profile** | 5 Low, 3 Medium, 8 High | | **Parallel capacity** | M5a-M5d have limited interdependencies | | **Dependencies** | Various from M2-M4 | **Success criteria:** - OAuth and MCP authentication work end-to-end (GAP-SEC-006, GAP-TOOLS-032) - Session rewind restores from arbitrary journal point (GAP-STATE-006) - Fork-join process pattern executes parallel branches (GAP-PAR-010) - LSP diagnostics feed into task routing (GAP-TOOLS-012) - All 78 non-CLOSED gaps addressed **Key risk:** Multiple L-effort high-risk items. Some may be deferred to future cycles if scope exceeds capacity. --- ## Effort Distribution ``` S M L Total Gaps M0 14 2 0 16 (+respec) M1 3 3 1 7 M2 13 1 2 16 M3 0 7 4 11 M4 4 3 5 12 M5 2 6 8 16 --- -- -- -- -- Total 36 22 20 78 ``` S = 1-2 days | M = 3-5 days | L = 1-2 weeks --- ## Status Category Distribution | Status | Count | Milestone Distribution | |--------|-------|----------------------| | IN_PROGRESS | 49 | M0: 12, M1: 6, M2: 10, M3: 7, M4: 8, M5: 6 | | OPEN | 22 | M0: 0, M1: 0, M2: 4, M3: 3, M4: 1, M5: 14 | | NEEDS_RESPEC | 7 | M0: 1 (respec only), M4: 6 | --- ## Priority Distribution | Priority | Count | Handling | |----------|-------|---------| | Critical | 4 | All in M0-M1 | | High | 30 | Spread across M0-M3, concentrated in M0 quick wins | | Medium | 37 | Spread across M2-M5 | | Low | 7 | Mostly M5 long-tail | --- ## Cross-Milestone Dependencies (Critical Chains) ``` M0: SUBOBS-001 -----> M1: SUBOBS-002 + PAR-001 -----> M3: PAR-003 + AGENT-003 M0: PROMPT-006 -----> M1: PERF-002 -----> M3: PROMPT-007 M0: REMOTE-007 -----> M2: REMOTE-003 -----> M5: SESSION-005 M0: ECO-003 -----> M2: ECO-002 -----> M3: ECO-001 M0: UX-001 respec --> M4: UX-001 impl --> M4: UX-001a/b/d/e/f M0: PROC-001 -----> M2: PROC-003 -----> M5: STATE-006 + RUN-003 ``` --- ## Recommended Cadence - **M0:** 2-3 week sprint (many parallel S items) - **M1:** 3-4 week sprint (focused critical path work) - **M2:** 4-6 week sprint (5 parallel streams, longest is ECO-002 at L) - **M3:** 4-6 week sprint (integration work, depends on M1+M2 completion) - **M4:** 4-6 week sprint (UX work, can partially overlap with M3) - **M5:** 6-8 week sprint (long-tail, can overlap with late M4) **Total estimated duration:** 6-8 months with 2-3 parallel contributors.
documents
[]

Outgoing edges

None.

Incoming edges

contains_page1
  • page:docs-genty-features-backlog-updated·PageGenty Features Backlog: Adversarial Gap Analysis

Related pages

No related wiki pages for this record.

Shortcuts

Open in graph
Browse node kind